Costco Retail Warehouse Lidcombe |
|
|
|
|
Written by AWJ Civil
|
|
Wednesday, 01 September 2010 |
|
Client: Hansen Yuncken Value: $5.0m Description: AWJ conducting bulk excavation works, stormwater construction, pavements for the new Costco Retail Facility at Lidcombe. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
K&S Freighters Container Terminal |
|
|
|
|
Written by AWJ Civil
|
|
Wednesday, 01 September 2010 |
|
Client: FIFE Capital Value: $2.7m Description: AWJ Civil constructed 14,000m² of heavy duty pre-stressed pavement to be used as a container terminal by K&S Freighters. Additionally to this stormwater and site services were also constructed. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
Wetherill Park Industrial Estate |
|
|
|
|
Written by AWJ Civil
|
|
Wednesday, 01 September 2010 |
|
Client: Ecocycle Material Value: $17m Description: The latest industrial estate to be developed in the Wetherill Park area. Consisting of 5 purpose built industrial facilities constructed to date by AWJ Civil on a 138,000m² estate. Including council roadworks, service reticulation and substantial site remediation activities. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
BER Schools Project Campbelltown |
|
|
|
|
Written by AWJ Civil
|
|
Wednesday, 01 September 2010 |
|
Client: Hansen Yuncken Value: $6.9m Description: Approximately 40 schools were undertaken in the Campbelltown region under the government's Building the Education Revolution project. Works involved were bulk excavation, essential services, concrete foundations, retaining walls and covered learning areas. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
Holsworthy Army Base Redevelopment Project |
|
|
|
|
Written by AWJ Civil
|
|
Wednesday, 01 September 2010 |
|
Client: Thomas & Coffey / Department of Defence Value: $4.4m Description: A project to redevelop the Holsworthy Army Base involving a major roadworks upgrade, construction of two wetland basins, and the beneficial reuse of approximately 120,000m³ of stockpiled site material. Design initiatives were provided to the client which offered significant program and cost savings. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
|
Hale St Botany Intersection Works |
|
|
|
|
Written by AWJ Civil
|
|
Tuesday, 31 August 2010 |
|
Client: ING Value: $3.6m Description: Consisting of the extension of Hale St to Foreshore Rd Botany safely diverting heavy vehicle traffic from travelling through residential areas. This involved bridge construction over two highly important and fragile infrastructure easements, service reticulation, RTA and Council roadworks, retaining wall construction and major intersection works joining Hale St and Foreshore Rd Botany. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
|
Written by AWJ Civil
|
|
Tuesday, 31 August 2010 |
|
Client: MIRVAC / ICPS Value: $4.2m Description: Bevchain Distribution Warehouse located in Auburn, AWJ conducted remediation on 80,000m³ of on site material, as well as the earthworks, stormwater construction, pavements and onsite detention tank. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
|
Written by AWJ Civil
|
|
Saturday, 04 April 2009 |
|
Client: Clyde Bergemann Senior Thermal Value: $4.8m Description: Eraring Power Station is sited in a natural dip on the western shore of Lake Macquarie near the township of Dora Creek. Works comprised of foundations including excavation, disposal of material on site, temporary works, blinding, reinforced concrete, supply and installation of embedment’s and backfilling. Construction of roads and hardstands, trenching for services and ducts and installation of over 6000 meters of HCSD pipeline. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
|
Written by AWJ Civil
|
|
Saturday, 04 April 2009 |
|
Client: Goodman Value: $13m Description: New Industrial Estate comprising of mass land clearing and tree removal, bulk excavation, stormwater drainage, estate roadworks and construction of numerous retaining walls over the site. Importation of over 300,000 cubic meters of material to fill the site to new design levels was required over the site, with areas of fill varying from 2 to 8 meters. During filling there were stages which saw 680 loaded truck & dog’s entering the site with filling material. Full time traffic controllers and personnel were required to watch the site entry during this stage. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
|
Woolworths Liquor Distribution Centre |
|
|
|
|
Written by AWJ Civil
|
|
Saturday, 05 July 2008 |
|
Client: Hansen Yuncken Value: $2.7m Description: Woolworths Liquor Distribution Centre is a 120,000 square metre industrial site at Erskine Park in which AWJ was responsible for earthworks, all stormwater construction over the site, and pavements. During the course of the project AWJ Civil also hired out numerous components of plant for the clients perusal. |
|
Last Updated ( Wednesday, 01 September 2010 )
|
|
|
|